World Cup Travel Update. Reservations required June 11–July 19, 2026 on all Pacific Surfliner trains. Visit Pacific Surfliner’s Soccer 2026 webpage for more details, and Amtrak’s RideReserve webpage to learn how to make a reservation for your multi-ride and monthly pass. Reservations can be made up to 14 days in advance.

 

Highway 101 – Santa Maria River Bridge

decorative background

Project funding

  • Project Sponsor: SBCAG and the California Department of Transportation (Caltrans)
  • Project Cost (at completion): $46.8 million
  • Measure A Funding Amount: $7.9 million
  • Estimated Non-Measure A Funding Amount: $38.9 million (STIP, ITIP and Proposition 1B)

Status

  • Planning
    Complete
  • Environmental
    Complete
  • Design
    Complete
  • Construction
    Complete
  • Completion
    Complete

The project was completed in 2015 and widened the Highway 101 Bridge over the Santa Maria River from 4 to 6 lanes to conform to the 6-lane configuration to the south through the City of Santa Maria. The project also constructed a Class I bike and pedestrian path along the southbound lanes of Highway 101.